Placement unlocked

The heat pump that fits where others can't.

THE FIN is engineered to deliver heat pumps where other units struggle to reach due to exclusion zones. Register your interest ahead of launch.

Register your interest → Shown at InstallerShow 2026
THE FIN installed in a tight corner between a door and fence
The placement problem
~30%

of homes have a placement issue that rules them out before a survey is even finished.

Zoning and planning regulations for heat pumps in the UK create a complex landscape that significantly dictates where these systems can be placed.

Early adoption has already harvested the easy installs. The next phase is structurally harder, and won't be unlocked by incremental product performance.

THE FIN unlocks
Terraces, tight plots & urban sites Boundary-limited & corner sites Visual & noise sensitivity Retrofit at scale New builds with shrinking external space
Close up of THE FIN's perforated directional-airflow panel
Airflow, redesigned

Solving the placement problem at the architecture level.

By rethinking airflow, orientation, service access and external appearance, THE FIN uses proprietary, patent-pending directional-airflow architecture to sit where standard products can't: corners, side returns, alleyways, tight against the building.

Corners
Side returns
Alleyways
Tight against the building

The aim is simple: more homes suitable, less outdoor space lost, cleaner installation, less visual compromise, better homeowner acceptance.

What it means for you

A wider addressable base — and cleaner jobs on site.

A wider addressable base

More of your pipeline becomes installable — homes standard units rule out.

Fewer abandoned surveys

No more jobs stalled or dropped on siting alone.

A stronger objection answer

Space, noise and appearance — handled by the architecture.

Cleaner, faster jobs

More installs that convert, with less disruption on site.

Validated by installers

Shown at InstallerShow 2026, where the response was clear.

THE FIN detail

"This solves a real installation problem."

Installer · InstallerShow 2026
THE FIN detail

"The corner concept is brilliant."

HVAC Manufacturer · InstallerShow 2026
THE FIN detail

"The best-looking heat pump we've seen."

Homeowner · InstallerShow 2026
Register your interest

Be first to fit the homes others can't.

Ahead of launch, we're opening early access to installers, firms and interested homeowners. Add your details and we'll be in touch.

Created by Sanowww.sano.co.uk

Early-access campaign · InstallerShow 2026 follow-up. We'll only use your details to keep you posted.